P-300 · Process

From first walk to keys.

Four stages, one team, and a fee that is fixed before the detailed drawings start. Scroll to move through the scales.

Stages

4

Fee

Fixed at stage 2

Site visits

Weekly

Site visits

Weekly

P-300 · How a project runs

1:

500

1:500

Stage 1 · weeks 1 to 4

Site and brief

We walk the land with you, measure the sun and the neighbours, and agree a budget before any drawing starts.

We walk the land with you, measure the sun and the neighbours, and agree a budget before any drawing starts.

Open sketchbook with a house drawing and a white card model on concrete
Open sketchbook with a house drawing and a white card model on concrete

1:100

Stage 2 · weeks 5 to 12

Plans you can walk

Three layouts at 1:100, a card model, and one fixed fee for everything that follows.

Three layouts at 1:100, a card model, and one fixed fee for everything that follows.

Layout drawings on a desk with a wooden ruler and pencil
Layout drawings on a desk with a wooden ruler and pencil

1:20

Stage 3 · weeks 13 to 26

Every joint drawn

Planning consent, then details at 1:20 so the builder prices what we drew, not what they guess.

Planning consent, then details at 1:20 so the builder prices what we drew, not what they guess.

Fan of material samples and stone blocks on a concrete surface
Fan of material samples and stone blocks on a concrete surface

1:1

Stage 4 · on site

Built at full size

We are on site every week until you hold the keys, and again one year later.

We are on site every week until you hold the keys, and again one year later.

Finished living space with an oak stair and a pale sofa
Finished living space with an oak stair and a pale sofa
Open sketchbook with a house drawing and a white card model on concrete
Layout drawings on a desk with a wooden ruler and pencil
Fan of material samples and stone blocks on a concrete surface
Finished living space with an oak stair and a pale sofa

P-310 · Before you ask

Plain answers.

When is the fee fixed?

When is the fee fixed?

At the end of stage 2, when the layout is agreed. Before that you pay a set sum for the site study and the first plans.

At the end of stage 2, when the layout is agreed. Before that you pay a set sum for the site study and the first plans.

Do you handle planning consent?

Do you handle planning consent?

Yes. We prepare and submit the application, speak to the planners, and attend the committee if there is one.

Yes. We prepare and submit the application, speak to the planners, and attend the committee if there is one.

Can we use our own builder?

Can we use our own builder?

Yes. We tender to three builders, and yours can be one of them. Everyone prices the same drawings.

Yes. We tender to three builders, and yours can be one of them. Everyone prices the same drawings.

How small is too small?

How small is too small?

We take extensions from about 40 square metres. Below that we will point you to someone good.

We take extensions from about 40 square metres. Below that we will point you to someone good.

C-800 · New commission

Start with a plan.

Tell us about the plot or the building. We reply within two working days with a first read of what is possible.

studio@quarrow.co · +44 20 5550 0188

studio@quarrow.co · +44 20 5550 0188

Practice

Quarrow Architects designs private homes and small public buildings from studios in Lisbon, London and Austin.

Drawing

Sheet Z-999 · End of set · Scale 1 : 1 · Rev. 2026

Quarrow

© 2026 Quarrow Architects

Practice

Quarrow Architects designs private homes and small public buildings from studios in Lisbon, London and Austin.

Drawing

Sheet Z-999 · End of set · Scale 1 : 1 · Rev. 2026

Quarrow

© 2026 Quarrow Architects

Practice

Quarrow Architects designs private homes and small public buildings from studios in Lisbon, London and Austin.

Drawing

Sheet Z-999 · End of set · Scale 1 : 1 · Rev. 2026

Quarrow

© 2026 Quarrow Architects

Create a free website with Framer, the website builder loved by startups, designers and agencies.