The stair at Cast Court is forty cubic metres of concrete with no joints. That means one pour, one day, and no second chance.

Why one pour

A joint in a stair shows forever. A cold joint in board-marked concrete shows twice, because the boards do not line up again. So we planned the day for three months.

What the day looked like

Trucks from 5 am, one every twelve minutes. Two pumps, in case one failed. One did. By 6 pm the boards were full and the site was quiet.

We struck the formwork nine days later. The grain of every board is in the wall.

C-800 · New commission

Start with a plan.

Tell us about the plot or the building. We reply within two working days with a first read of what is possible.

studio@quarrow.co · +44 20 5550 0188

studio@quarrow.co · +44 20 5550 0188

Practice

Quarrow Architects designs private homes and small public buildings from studios in Lisbon, London and Austin.

Drawing

Sheet Z-999 · End of set · Scale 1 : 1 · Rev. 2026

Quarrow

© 2026 Quarrow Architects

Practice

Quarrow Architects designs private homes and small public buildings from studios in Lisbon, London and Austin.

Drawing

Sheet Z-999 · End of set · Scale 1 : 1 · Rev. 2026

Quarrow

© 2026 Quarrow Architects

Practice

Quarrow Architects designs private homes and small public buildings from studios in Lisbon, London and Austin.

Drawing

Sheet Z-999 · End of set · Scale 1 : 1 · Rev. 2026

Quarrow

© 2026 Quarrow Architects

Create a free website with Framer, the website builder loved by startups, designers and agencies.